Test Plan Structure | Live Example of Test Plan





Test Plan Structure:
This section will explain you about the Test Plan and Test Plan Strategy and its structure document. How one can create it from the scratch..

Live Example of Test Plan:
i.                    Our previous tutorials have already explained that there are more than 100 types of testing types and this is not possible to test application with all these types.
ii.                  Like Railway reservation application, we should want to check the system to confirm it functionalities on different – 2 operating systems.
iii.                If it is not the web based application or website then no need to test it on different -2 browsers, and if it is website then it is necessary to test on different – 2 browsers.
iv.                So as like above analysis, we can decide the testing types, scope and scenarios what need to test and what we can leave and what will the scope of testing or how many scenarios or test cases are required for Train reservation application.
v.                  You need to guess and identify the all possible future risk in current, and planning will be according to these decisions related to future risk.
vi.                There are mainly two types of risks which can interrupt a. Project Risks b. Product Risk.
vii.              Now need to confirm the risk priority which risk can be on high priority and which is on low priority. We can identify it by scaling 1-10.
viii.            Identifying the risk is not enough we need to find the solutions for these also.
ix.                Next one is Product Risk, if we need to upload the changes on test server for Railway Reservation application then it is not possible so this will called product risk.
x.                  In this risk solution can be found by either smoke or sanity testing. We can perform one of them to improvement.
TEST PLAN STRUCTURE
TEST PLAN STRUCTURE
xi.                We can say it the risk based strategy of testing. There is lot of techniques for testing for your selection, but we need to select only suitable and appropriate technique to save time for budgeted work.
xii.              Performance testing required for multiple cases but not required for everywhere like Train Reservation System.

So we can say that test plan is the already decided strategy which includes the information about the Schedule, Test Estimates, Testing Techniques, Test Team and so on.
 Test plan generally control the maintenance of progress of different – 2 testing activities and co –operates to take monitoring the actions if there is any difference, deviations from the planned activities.






test plan structure, live example of test plan, risk based strategy of testing, project risk, product risk, how to create test plan, what is the estimation of test plan, test plan document.