Kinds of Software Testing, Load Testing, Keyword Driven Testing, Inter Systems Testing, Install Testiing



Load Testing: This kind of testing confirm the positive and possible response of application on required load. To test the application ability to bear the specific load is called Load Testing. This kind of testing generally performed by the Performance Engineers.

  1. Keyword – Driven Testing: This is also known as action-word testing or table driven testing. This kind divided the testing process into two stages: i. First Planning Stage and Second is Implementation Stage. This type of testing can be used in automation or manual both testing terms.
  2. Inter – Systems Testing: In this testing Test Engineers ensure the interconnection in between the application functions properly and correctly. This testing usually conducted by the Test engineers Team.
  3. Internationalization Testing: Testing the application with different languages and locale. In this testing test engineer will ensure that application should work proper on different languages and locale. This testing has been done by the Test Engineers Team.
  4. Install/Uninstall Testing: This testing will confirm what software or tool, customer need to install or uninstall to run the currently developed application. Software Test Engineer performs this type of testing.
  5. Interface Testing: This testing confirms whether the applications components control and data pass correctly each other or not. Both Developers and Test Engineers perform this testing.
  6. Integration Testing: All units or modules integrated in combined module or application and then Testing Team engineers test this combined module. This type of testing is called Integration Testing.
  7. Hybrid Integration Testing: This is the combination of bottom-up integration and top –down integration techniques. This technique contains the both types of testing. So this testing done by the testing team engineers.
  8. Globalization Testing: Test Team Engineers test the functionality of the application with any one from the locale/culture setting using maximum type of possible international input.
  9. GUI Software Testing: This testing confirms the client requirement for the graphical user interface for the developed application. This type of testing only done by the Test Team Engineers.
  10. Glass Box Testing: It is similar to white box testing. Here Tester requires the internal code and technology knowledge. So this testing generally performed by the Development Team.
  11. Gray Box Testing: Grab box testing is the combination of black box testing and white box testing. Here tester requires the knowledge for code technology and requirement specification. This testing can be completed by the software engineers or the Test Team Engineers.
  12. Gorilla Testing: In this testing, Tester focuses on specific module of application which requires heavily testing of that particular module. Usually this testing done by the quality assurance team while executing the full testing.
  13. Fuzz Testing: This type of testing id done with the invalid, unexpected or random data. Such types of inputs are used to break the application functionality. This kind of testing required on some specific are of application not on all areas. This testing usually completed by the Test Team Engineers.
  14. Functional Testing: It is a type of Black box testing which confirm and verify the all functionality of software according to provided requirement by the client. This testing verify the client requirement are fulfill or not in the view of functionality. This testing only done by the Test Team Engineers.
kind of software testing, fuzz testing, gorilla testing, GUI software testing, globalization testing, glass box testing, hybrid integration testing, interface testing, internationalization testing, inter system testing


No comments:

Post a Comment

Popular Posts